Projects

The Project Pipeline

Gold-Bearing Resources Across the American Southwest

Gold Vault has built a substantial pipeline of historic mine opportunities, with a particular focus on Nevada and Arizona.

From Thousands of Targets to Selected Opportunities

Gold Vault’s proprietary database contains more than 10,000 historic mine sites. More than 80 sites in Nevada and Arizona have undergone detailed analysis, providing a pipeline from which Gold Vault can select projects meeting its technical and economic criteria.

Featured Project

Jessup, Nevada

Located in Northern Nevada, Jessup is the first Gold Vault site scheduled for full production.

  • 50,000 tons – of gold and silver-bearing surface ore
  • 15 major piles – of historic material
  • 3.4 grams/ton – approximate recovery demonstrated through test processing

The material was mined more than a century ago and remains concentrated in above-ground piles. Gold Vault received a BLM permit in April 2025 to process an initial 1,000 tons, with full production scheduled in the materials for Q1 2027.

A Scalable Pipeline

Beyond a Single Mine

Gold Vault’s strategy is not dependent on a single deposit. Its database, sampling program, and project-selection process are designed to create a repeatable pipeline of opportunities across multiple historic mining districts.

The latest investment materials report more than 2.5 million tons of identified surface ore within Gold Vault’s broader resource portfolio.

Top